# | Product description | Arrival date | Importer | Supplier | Country of Origin | Weight | Unit | Quantity | Bill of Lading | Hs code |
|---|---|---|---|---|---|---|---|---|---|---|
1 . | USED WOLFFKRAN TOWER CRANE MODEL: 700B Y. O.M.:201... | 2023-10-11 | Advance Triwest Equipment Ltd | CHUN TIM ENGINEERING AND EQUIPMENT UNIT | HONG KONG | 74,792.00 | kg | 13 | 292145 | |
2 . | USED WOLFFKRAN TOWER CRANE MODEL: 700B Y. O.M.:201... | 2023-10-11 | Advance Triwest Equipment Ltd | CHUN TIM ENGINEERING AND EQUIPMENT UNIT | HONG KONG | 62,410.00 | kg | 21 | 290490 | |
3 . | USED WOLFFKRAN TOWER CRANE MODEL: 700B Y. O.M.:201... | 2023-09-23 | Advance Triwest Equipment Ltd | CHUN TIM ENGINEERING AND EQUIPMENT UNIT | HONG KONG | 39,740.00 | kg | 5 | 852990 | |
4 . | USED WOLFFKRAN TOWER CRANE MODEL: 700B Y. O.M.:201... | 2023-09-23 | Advance Triwest Equipment Ltd | CHUN TIM ENGINEERING AND EQUIPMENT UNIT | HONG KONG | 41,870.00 | kg | 12 | 292145 |
# | Supplier | Country | Most recent | No. of TEU’s | Gross weight | Unit |
|---|---|---|---|---|---|---|
1. | CHUN TIM ENGINEERING AND EQUIPMENT UNIT | HONG KONG | 2023-10-11 | 23.50 | 218,812.00 | kg |
# | Port | Country | Most recent | No. of times | Gross weight | Unit |
|---|---|---|---|---|---|---|
1. | 58201, HONG KONG | HONG KONG | 2023-09-23 | 2 | 81,610.00 | kg |
2. | 57035, SHANGHAI | HONG KONG | 2023-10-11 | 2 | 137,202.00 | kg |
# | Hs code | Category | Most recent | No. of times | Gross weight | Unit | Description |
|---|---|---|---|---|---|---|---|
1. | 292145 | 1-Naphthylamine (α-Naphthylamine), 2-Naphthylamine (β-Naphthylamine), and their derivatives; salts thereof: | 2023-10-11 | 2 | 116,662.00 | kg | USED WOLFFKRAN TOWER CRANE MODEL: 700B Y. O.M.:2014 INCLUDING.... 1. TOWER HEAD SEC TION--- 1 PC TOWER HEAD SECTION BRACE--- 1 P C AUXILLARY CRANE--- 1 PC 2. JIB SECTIO N 1--- 1 PC ERECTION WIRE ROPES--- 1 PC 4.5 TON TOP COUNTER WEIGHT--- 1 PC 3. COUN TER JIB--- 1 PC 8 TON COUNTER WEIGHT --- 1 P C COUNTER JIB PLATFORM--- 1 PC DRIVER S CAB SUSPENSION--- 1 PC KSH23 CLIMBING FRAME--- 2 PCSUSED WOLFFKRAN TOWER CRANE MODEL: 700B Y. O.M.:2014 INCLUDING.... 1. TOWER HEAD SEC TION--- 1 PC TOWER HEAD SECTION BRACE--- 1 P C AUXILLARY CRANE--- 1 PC 2. JIB SECTIO N 1--- 1 PC ERECTION WIRE ROPES--- 1 PC 4.5 TON TOP COUNTER WEIGHT--- 1 PC 3. COUN TER JIB--- 1 PC 8 TON COUNTER WEIGHT --- 1 P C COUNTER JIB PLATFORM--- 1 PC DRIVER S CAB SUSPENSION--- 1 PC KSH23 CLIMBING FRAME--- 2 PCSUSED WOLFFKRAN TOWER CRANE MODEL: 700B Y. O.M.:2014 INCLUDING.... 1. TOWER HEAD SEC TION--- 1 PC TOWER HEAD SECTION BRACE--- 1 P C AUXILLARY CRANE--- 1 PC 2. JIB SECTIO N 1--- 1 PC ERECTION WIRE ROPES--- 1 PC 4.5 TON TOP COUNTER WEIGHT--- 1 PC 3. COUN TER JIB--- 1 PC 8 TON COUNTER WEIGHT --- 1 P C COUNTER JIB PLATFORM--- 1 PC DRIVER S CAB SUSPENSION--- 1 PC KSH23 CLIMBING FRAME--- 2 PCS |
2. | 852990 | Parts suitable for use solely or principally with the apparatus of headings 8524 to 8528: | 2023-09-23 | 1 | 39,740.00 | kg | USED WOLFFKRAN TOWER CRANE MODEL: 700B Y. O.M.:2014 INCLUDING.... 1. CONNECTING BLO CK (K FRAME)--- 1 PC SLEWING FRAME--- 1 PC TOWER TOP LOWER ADAPTER--- 1 PC 2. HOIST GEAR MACHINE--- 1 PC LUFFING GEAR MACHINE - -- 1 PCUSED WOLFFKRAN TOWER CRANE MODEL: 700B Y. O.M.:2014 INCLUDING.... 1. CONNECTING BLO CK (K FRAME)--- 1 PC SLEWING FRAME--- 1 PC TOWER TOP LOWER ADAPTER--- 1 PC 2. HOIST GEAR MACHINE--- 1 PC LUFFING GEAR MACHINE - -- 1 PC |
3. | 290490 | Sulfonated, nitrated or nitrosated derivatives of hydrocarbons, whether or not halogenated: | 2023-10-11 | 1 | 62,410.00 | kg | USED WOLFFKRAN TOWER CRANE MODEL: 700B Y. O.M.:2014 INCLUDING.... 1. JIB SECTION 2 --- 1 PC 5.97 TON STEEL COUNTER WEIGHT--- 3 PCS 2. HT23 TOWER SECTION--- 2 PCS DRIVE R S CAB--- 1 PC 3. HT23 TOWER SECTION--- 1 PC JIB SECTION 3--- 1 PC 4. HT23 TOWER SECTION--- 1 PC KSH23 CLIMBING FRAME--- 6 P CS PLATFORM--- 1PC 5. HT23 TOWER SECTION --- 2 PCS DRIVER S CAB--- 1 PC POWER CABLE- -- 1 PCUSED WOLFFKRAN TOWER CRANE MODEL: 700B Y. O.M.:2014 INCLUDING.... 1. JIB SECTION 2 --- 1 PC 5.97 TON STEEL COUNTER WEIGHT--- 3 PCS 2. HT23 TOWER SECTION--- 2 PCS DRIVE R S CAB--- 1 PC 3. HT23 TOWER SECTION--- 1 PC JIB SECTION 3--- 1 PC 4. HT23 TOWER SECTION--- 1 PC KSH23 CLIMBING FRAME--- 6 P CS PLATFORM--- 1PC 5. HT23 TOWER SECTION --- 2 PCS DRIVER S CAB--- 1 PC POWER CABLE- -- 1 PCUSED WOLFFKRAN TOWER CRANE MODEL: 700B Y. O.M.:2014 INCLUDING.... 1. JIB SECTION 2 --- 1 PC 5.97 TON STEEL COUNTER WEIGHT--- 3 PCS 2. HT23 TOWER SECTION--- 2 PCS DRIVE R S CAB--- 1 PC 3. HT23 TOWER SECTION--- 1 PC JIB SECTION 3--- 1 PC 4. HT23 TOWER SECTION--- 1 PC KSH23 CLIMBING FRAME--- 6 P CS PLATFORM--- 1PC 5. HT23 TOWER SECTION --- 2 PCS DRIVER S CAB--- 1 PC POWER CABLE- -- 1 PCUSED WOLFFKRAN TOWER CRANE MODEL: 700B Y. O.M.:2014 INCLUDING.... 1. JIB SECTION 2 --- 1 PC 5.97 TON STEEL COUNTER WEIGHT--- 3 PCS 2. HT23 TOWER SECTION--- 2 PCS DRIVE R S CAB--- 1 PC 3. HT23 TOWER SECTION--- 1 PC JIB SECTION 3--- 1 PC 4. HT23 TOWER SECTION--- 1 PC KSH23 CLIMBING FRAME--- 6 P CS PLATFORM--- 1PC 5. HT23 TOWER SECTION --- 2 PCS DRIVER S CAB--- 1 PC POWER CABLE- -- 1 PCUSED WOLFFKRAN TOWER CRANE MODEL: 700B Y. O.M.:2014 INCLUDING.... 1. JIB SECTION 2 --- 1 PC 5.97 TON STEEL COUNTER WEIGHT--- 3 PCS 2. HT23 TOWER SECTION--- 2 PCS DRIVE R S CAB--- 1 PC 3. HT23 TOWER SECTION--- 1 PC JIB SECTION 3--- 1 PC 4. HT23 TOWER SECTION--- 1 PC KSH23 CLIMBING FRAME--- 6 P CS PLATFORM--- 1PC 5. HT23 TOWER SECTION --- 2 PCS DRIVER S CAB--- 1 PC POWER CABLE- -- 1 PC |